merXu
Cancel
merXu Protected Payments
Secure your payment until delivery.
Elements for the construction of a structure concreted into the ground on 16 panels with dimensions up to 230cm x 115cm/30mm vertically, arrangement 8x2

Elements for the construction of a structure concreted into the ground on 16 panels with dimensions up to 230cm x 115cm/30mm vertically, arrangement 8x2

Register or login to start shopping
Offer from supplier:
Login to start shopping
Verified
Country of dispatch:
Poland
Destination countries:
+23 more
Estimated shipping date:
within 4 working days
Payment methods recommended by merXu:
Recommended by merXu
merXu Protected Payments
merXu Protected Payments
Secure your payment until delivery. Free of charge.
Learn more
Alternative payment methods:
Blik
Credit / debit card
Online banking
Wire transfer
Description
A set of elements for self-construction of an assembly system for 16 panels vertically, in an arrangement 8x2 concreted in the ground, (8 panels in a row, 2 rows).The system is not intended to be installed on the roof!(not certified for safety and resistance to, for example, wind)
It is a complete system and includes all elements except concrete for pouring.Assembly requires cutting the elements to the required length and drilling holes fi 10.The tools needed are an angle saw, a drill with a metal drill bit fi 10 and a wrench for turning. as well as a shovel or drill for digging.
System for panels of thickness 30mm,, length from 164 to 230 cm, maximum width of panels 115cm
Installation instructions:
We make elements from steel profiles 40x60 as shown in the drawing and mount them with screws M10x120 (red).We drill holes for the screws fi 10. 5 of such sets
NOTE: 5 of the bars must be cut to obtain the elements 140cm, 90cm, and 3 the bars must be cut in half, i.e. after 115cm  (1 the element 115cm will remain unused)
The yellow screw M10x140 connects the elements 3, i.e. those 115cm and 230cm with an overlap of approx. 6cm and a brace 90cm.
Then we make 8 excavations for concreting.In one direction, 220 centimeters apart (as in the drawing) and the entire structures are 200cm apart (squares 2x2m).It is worth planning the layout in advance (try on the 40x40). profiles
It is important that the structures are concreted evenly and vertically.After the concrete has hardened, we install 8 aluminum profiles 40x40 horizontally at both ends of the inclined plane (we connect the profiles together with connectors and screws M10x25) and around the center another 8 profiles horizontally spaced approx. 40cm.Profiles 40x40 are screwed to the posts with screws M10x80
Place the panels on the profiles and fasten them with clamps.
If strong side winds are expected, the structure can be additionally strengthened with the so-called bracing/strut using additional 2 posts with a length of 230cm attached to the back of the structure at an angle (one fastening at the bottom of the set in the drawing, and the other at the top of the set in the drawing).We dig up these struts separately - they are not included in this set.
The effective angle of inclination of the panels is 24 degrees.

New to buying at merXu?

It’s easier than you think. We provide you with a step-by-step guide.

Negotiate with the seller

You can contact the seller to adjust your order, negotiate the price, or inquire about other offers from their portfolio before making a purchase. Choose and click on the offer you are interested in. Find the button "SEND INQUIRY" on the right side of the offer and you will be moved directly to a chat with the seller.

One Request, Multiple Quotes
Request for quotes by telling supplier what you need.