merXu
Tühista
merXu Protected Payments
Kindlustage oma makse kuni kohaletoimetamiseni.
Elemendid maapinnale betoneeritud konstruktsiooni ehitamiseks 24 paneelidel mõõtmetega kuni 230cm x 114cm/30mm vertikaalselt, paigutus 12x2

Elemendid maapinnale betoneeritud konstruktsiooni ehitamiseks 24 paneelidel mõõtmetega kuni 230cm x 114cm/30mm vertikaalselt, paigutus 12x2

Registreeri või Logi sisse, et alustada ostlemist
Tarnija pakkumine:
Ostu alustamiseks logige sisse
Kinnitatud
Lähteriik:
Poola
Sihtriigid:
+27 rohkem
Eeldatav tarnekuupäev:
4 tööpäeva jooksul
MerXu poolt soovitatud makseviisid:
Soovitatav merXu
merXu Protected Payments
merXu Protected Payments
Kindlustage oma makse kuni kohaletoimetamiseni. Tasuta.
Saa rohkem teada
Alternatiivsed makseviisid:
Blik
Krediit / deebetkaart
Online banking
Pangaülekanne
Kirjeldus
A set of elements for self-construction of an assembly system for 24 panels vertically, in an arrangement 12x2 concreted in the ground (12 panels in a row, 2 rows).The system is not intended to be installed on the roof!(not certified for safety and resistance to, for example, wind)
It is a complete system and includes all elements except concrete for pouring.
System for panels of thickness 30mm,, length from 164 to 230 cm, maximum width of panels 114cm
Installation instructions:
We make elements from steel profiles 40x60 as shown in the drawing and mount them with screws M10x120 (red).We drill holes for the screws fi 10. 7 of such sets
NOTE: 7 of the bars must be cut to obtain the elements 140cm, 90cm, and 2 the bars must be cut in half, i.e. after 115cm  (1 the element 115cm will remain unused)
The yellow screw M10x140 connects the elements 3, i.e. those 115cm and 230cm with an overlap of approx. 6cm and a brace 90cm.
Then we make 14 excavations for concreting.In one direction, approximately 220 centimeters apart (as in the picture) and the entire structures are 210cm apart (squares 2x2,1m).It is worth planning the layout in advance (try on the 40x40). profiles
It is important that the structures are concreted evenly and vertically.After the concrete has hardened, we install 12 aluminum profiles 40x40 horizontally at both ends of the inclined plane (we connect the profiles together with connectors and screws M10x25) and around the center another 12 profiles horizontally spaced approx. 40cm.Profiles 40x40 are screwed to the posts with screws M10x80
Place the panels on the profiles and fasten them with clamps.
If strong side winds are expected, the structure can be additionally strengthened with the so-called bracing/strut using additional 2 posts with a length of 230cm attached to the back of the structure at an angle (one fastening at the bottom of the set in the drawing, and the other at the top of the set in the drawing).We dig up these struts separately - they are not included in this set.
The effective angle of inclination of the panels is 24 degrees.

Olete uus ostja merXu-s?

See on lihtsam kui arvate. Pakume teile samm-sammult juhendit

Läbirääkimised müüjaga.

Võite müüjaga ühendust võtta, et kohandada oma tellimust, läbirääkida hinda või küsida teisi pakkumisi nende portfellist enne ostu sooritamist. Valige ja klõpsake pakkumisel, mis teile huvi pakub. Leidke nupp "SAADA PÄRING" pakkumise paremal küljel ja teid suunatakse otse vestlusesse müüjaga

Üks taotlus, mitu hinnapakkumist
Looge päring, öeldes tarnijale, mida vajate.