Synergy Manager + 3x SESUK
Contains communication board, AC and DC connection: no need to open the inverter units during installation
Reduced BoS with support for single DC input and cost-effective aluminium cables
Separation of AC and DC connections
3 Synergy Units needed
Three Phase Inverter with Synergy Technology
Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection
Easy 2-person installation with lightweight, modular design
Independent operation of each Synergy Unit enables higher uptime and easy serviceability
Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety
Built-in arc fault protection and optional rapid shutdown
Built-in PID mitigation for maximized system performance
Monitored (Applicable only for DC and AC SPDs) and field-replaceable surge protection devices, to better withstand surges caused by lightning or other events: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD
Optional integrated DC safety switch eliminates the need for external DC isolators
Built-in module-level monitoring with Ethernet or cellular communication for full system visibility