merXu
Cancelar
merXu Protected Payments
Asegure su pago hasta la entrega.
Elementos para la construcción de una estructura hormigonada en el suelo sobre paneles 16 con dimensiones hasta 230cm x 115cm/30mm verticalmente, disposición 8x2

Elementos para la construcción de una estructura hormigonada en el suelo sobre paneles 16 con dimensiones hasta 230cm x 115cm/30mm verticalmente, disposición 8x2

Registro o acceso para empezar a comprar
Oferta del proveedor:
Iniciar sesión para empezar a comprar
Verificado
País de envío:
Polonia
Países de destino:
+27 más
Fecha estimada de envío:
en 4 días laborables
Formas de pago recomendadas por merXu:
Recomendado por merXu
merXu Protected Payments
merXu Protected Payments
Asegure su pago hasta la entrega. Gratuito.
Más información
Métodos de pago alternativos:
Blik
Tarjeta de crédito/débito
Banca electrónica
Transferencia bancaria
Descripción
A set of elements for self-construction of an assembly system for 16 panels vertically, in an arrangement 8x2 concreted in the ground, (8 panels in a row, 2 rows).The system is not intended to be installed on the roof!(not certified for safety and resistance to, for example, wind)
It is a complete system and includes all elements except concrete for pouring.Assembly requires cutting the elements to the required length and drilling holes fi 10.The tools needed are an angle saw, a drill with a metal drill bit fi 10 and a wrench for turning. as well as a shovel or drill for digging.
System for panels of thickness 30mm,, length from 164 to 230 cm, maximum width of panels 115cm
Installation instructions:
We make elements from steel profiles 40x60 as shown in the drawing and mount them with screws M10x120 (red).We drill holes for the screws fi 10. 5 of such sets
NOTE: 5 of the bars must be cut to obtain the elements 140cm, 90cm, and 3 the bars must be cut in half, i.e. after 115cm  (1 the element 115cm will remain unused)
The yellow screw M10x140 connects the elements 3, i.e. those 115cm and 230cm with an overlap of approx. 6cm and a brace 90cm.
Then we make 8 excavations for concreting.In one direction, 220 centimeters apart (as in the drawing) and the entire structures are 200cm apart (squares 2x2m).It is worth planning the layout in advance (try on the 40x40). profiles
It is important that the structures are concreted evenly and vertically.After the concrete has hardened, we install 8 aluminum profiles 40x40 horizontally at both ends of the inclined plane (we connect the profiles together with connectors and screws M10x25) and around the center another 8 profiles horizontally spaced approx. 40cm.Profiles 40x40 are screwed to the posts with screws M10x80
Place the panels on the profiles and fasten them with clamps.
If strong side winds are expected, the structure can be additionally strengthened with the so-called bracing/strut using additional 2 posts with a length of 230cm attached to the back of the structure at an angle (one fastening at the bottom of the set in the drawing, and the other at the top of the set in the drawing).We dig up these struts separately - they are not included in this set.
The effective angle of inclination of the panels is 24 degrees.

¿Es nuevo en las compras en merXu?

Es más fácil de lo que piensa. Le proporcionamos una guía paso a paso

Negocie con el vendedor

Puede contactar al vendedor para ajustar su pedido, negociar el precio o preguntar acerca de otras ofertas de su portafolio antes de realizar una compra. Elija y haga clic en la oferta que le interesa. Encuentre el botón "ENVIAR CONSULTA" en el lado derecho de la oferta y se le dirigirá directamente a un chat con el vendedor

Una solicitud, varios presupuestos
Cree una consulta indicando al proveedor lo que necesita.